Ecolibrium

 

October and November 2020

  

 

 

 

Son rise, sunset
(full article)
A third-generation member of AIRAH, Peter Dobney, F.AIRAH, has enjoyed a career of considerable variety and influence. After starting professional life as an HVAC engineer, he concluded it by managing energy contracts for major Australian manufacturers. 
Union specific

(full article)  

The i-Hub Integrated Design Studio for data centre design seeks to provide a better marriage between the disciplines of engineering and architecture. The aim is to provide improved technical performance while maximising building amenity and community engagement.  

Critical response 

(full article)  

Data centres have never been tested like they have in 2020, as working from home became a key feature in our response to the COVID-19 pandemic.

LEEDer of the pack 

(full article)  

As well as boasting a design that places sports fans closer to the action, Bankwest Stadium in Parramatta is the first sports stadium in the world to announce LEED v4 Gold sustainability certification from the US Green Building Council.

Section J Case Study series: Fans 

(full article)  

This case study looks at the design requirements to assess this set-up in accordance with the DtS provisions of the NCC 2019.

By Ken Thomson, M.AIRAH

 
Section J Case Study series: Ductwork

(full article)  

 

This case study will investigate some of the complexities in the application of the DtS provisions and the impacts it has on ductwork sizing and overall efficiency of the ductwork.

By Ken Thomson, M.AIRAH